The boat-trailer launch and recovery device has a right rail and a left rail,
which rails are attached to a trailer post by holding plates. The right rail and
the left rail each have a bend section. A spring loaded gate is attached to either
the right rail or the left rail. A stop bar connects the right rail and the left
rail between the spring loaded gate and the trailer post. Attached to the bow of
work piece boat is a removable bow post, which bow post has a socket, an inner
core pipe section, and an outher PVC sleeve which freely rotates around the inner
core pipe section. The outer PVC sleeve is held in place with a collar and a collar
set screw with a cap at top. The right rail and the left rail each have one or
more trailer post adjustment holes and one or more gate adjustment holes. The trailer
post holding plates have four or more bolt holes to adjust the height of the rails.