Methods are provided comprising providing a sealant composition comprising
an aqueous fluid, a diutan composition, at least one gel system, and a
leak off prevention material; introducing the sealant composition into a
well bore penetrating the subterranean formation; and allowing the
sealant composition to form a seal.