A stress transmission device arranged between a pile head of a foundation
pile and an upper structural portion for transmitting stress between the
foundation pile and the upper structural portion, to a structure which
employs such a stress transmission device, and to a method of constructing
such a structure. In the figures, a pile head member 5 is provided to the
pile head 2a of the foundation pile 2, a structure support member 6 is
fixed to an upper structural portion 3, and these mutually contact one
another in the vertical direction via a first contacting surface 11 which
defines a portion of a first imaginary spherical surface Sv1. And a
prestressing steel rod 7 is fitted to the pile head member 5 and the
structure support member 6 for holding them together in contact while
pressing them together via the first contacting surface 11.
Приспособление передачи усилия аранжировало между головкой кучи кучи учредительства и верхней структурно частью для передавая усилия между кучей учредительства и верхней структурно частью, к структуре которая использует такое приспособление передачи усилия, и к методу строить такую структуру. В рисунках, член 5 головки кучи снабжен головка 2Јa кучи кучи 2 учредительства, член 6 поддержки структуры зафиксирован к верхней структурно части 3, и эти взаимно контактируют одно другое в вертикальном направлении через поверхность 11 первого контакта которая определяет часть первой мнимой сферически поверхности Sv1. И стальная штанга 7 приспособлена к члену 5 головки кучи и члену 6 поддержки структуры для держать их совместно в контакт пока отжимающ их совместно через поверхность 11 первого контакта.