A method, system, and software for assessing the cost tradeoffs associated
with performing inspection includes determining measurement variations
and product characteristic variations to define an inspection plane. The
inspection plane is divided into a plurality of regions corresponding to
respective different outcomes resulting from an inspection process. The
probability of each outcome is determined based on a probability mass in
each region of the inspection plane, wherein the probability mass is
based on a joint probability density of the measurement and product
characteristic variations. Costs are associated to various outcomes based
on the inspection process, and overall costs of the inspection process
are computed by using the associated costs and the determined probability
of each outcome based on the regions of the inspection plane.